Citrus Heights Water District (CHWD) District-Wide Land Rights Inventory Project

The District-Wide Land Rights Project was conceived and designed to ensure all water facilities and operations were protected. BRI first conducted a thorough inventory of existing easements provided by CHWD to expose gaps in land rights coverage. We researched the gaps to identify any easements, public utility easements and verified facilities within existing public right of ways. BRI was responsible for the land rights inventory and research phases, as well as subsequent acquisition and GIS indexing.

What Inspired Us:
BRI was uniquely positioned for this project by having unmatched land rights experience and expertise in conducting land rights research, interpreting legal descriptions, and plotting easement boundaries for GIS spatial data creation.

Delta Conveyance Design and Construction Authority State Water Project

The project will construct one or two large, four-story tall tunnels to carry freshwater from the Sacramento River under the Sacramento-San Joaquin Delta toward southern intake stations. This is the largest water project in the state and the construction and operation of the project will depend on the acquisition of land rights for permanent and temporary use from up to 300 properties.

What Inspired Us:
To establish a stronger water delivery infrastructure for California and the 25 million people depending on clean water.